Toshiba Electronic Devices and Storage Corporation · Other integrated circuits
TB6584AFNG
IC MOTOR DRIVER 6V-16.5V 30SSOP
A multi-brand MCU and embedded-component workspace. Compare recorded cores, memory, interfaces and packages while retaining firmware, board and manufacturer constraints.
Request this exact part →TB6584AFNG specifications
Recorded source facts. Missing values are kept explicit; verify the exact manufacturer document before design approval.
| Manufacturer | Toshiba Electronic Devices and Storage Corporation |
|---|---|
| Ordering code | TB6584AFNG |
| Family | Other integrated circuits |
| Package | 30-LSSOP (0.220", 5.60mm Width) |
| Product Status | Active |
| Motor Type - Stepper | Not provided in source |
| Motor Type - AC, DC | Brushless DC (BLDC) |
| Function | Controller - Commutation, Direction Management |
| Output Configuration | Half Bridge (3) |
| Interface | Parallel |
| Technology | Power MOSFET |
| Step Resolution | Not provided in source |
| Applications | Fan Controller |
| Current - Output | Not provided in source |
| Voltage - Supply | 6V ~ 16.5V |
| Voltage - Load | Not provided in source |
| Operating Temperature | -30°C ~ 115°C (TA) |
| Mounting Type | Surface Mount |
| Package / Case | 30-LSSOP (0.220", 5.60mm Width) |
| Supplier Device Package | 30-SSOP |
Documents and evidence
TB6584AFNG ↗Catalog sources
www.ic-components.com · TB6584AFNG ↗Source directory identity match; source detail pending. Specifications remain from existing catalog.
Before sourcing TB6584AFNG
- Start from engineering requirements
- Record toolchain and firmware dependencies
- Verify package, pinout and peripherals
- Approve alternatives before procurement
Questions about TB6584AFNG
How do I request a current price?
Provide this full code, quantity, destination and arrival date. Budget estimates are conditional; final availability and price are confirmed by quotation.
Can a related record replace this device?
Related records aid discovery. Package, pinout, ratings, tooling and software require engineering approval before substitution.